On-Site Service Relocation of Manufacturing Facility Equipment

JB Tool, Die & Engineering, Inc. employs outstanding engineers who are skilled in shop floor know-how. This technical assistance was called upon when a customer needed to relocate their manufacturing facility to another state. In less than six months our engineering and project management team completed the project to the customer’s satisfaction.

This relocation project required us to perform engineering upgrades on the new site in addition to designing the layout of the new floor space. Once the new site was ready to receive the equipment, the breakdown of the old facility began: 13 manufacturing cells, containing 6 major pieces of equipment each, were removed for relocation. We worked with the client to find properly insured, local subs to handle the rigging and millwright services needed for equipment removal and reinstallation, technical services, and advice throughout the project.

During this relocation, machinery repairs and necessary upgrades were performed by our approved, subcontracted millwrights. After re-installation, we furnished new product handling systems and worked with the client as they performed line shakedowns. We were also involved with machine qualification, process capability, and staff training to ensure that the facility would be up and running when this relocation was complete.

More information on our relocation services can be found in the table below or contact us directly.

Equipment Relocation Services Project Highlights

Capabilities Applied/Processes
(Machining, Molding, Welding, etc...)
Engineering, Project Management, Rigging and Millwright services
  • Engineering for building upgrades
    of new site prior to equipment move
  • Redesign cell layouts for
    new floor space
  • Provide project timeline
    facilitating minimum downtime
  • Work with local contractors
  • Furnish packaging
  • Schedule Logistics
  • Furnish technical labor for
    removal and re-installation
  • Machine disconnect and re-wiring
  • Perform machine repairs
    and upgrades during transition
  • Furnish complete
    new product handling systems
  • Perform line shakedowns
  • Assist plant with machine
    qualification and process capability
  • Assist with training @ new facility
Delivery TimeLess Than 6 months
Delivery LocationAcross 4 States
Standards Met
(Customer Supplied Print, ISO, ASTM, etc...)
Customer specifications
Project ScopeRemove and relocate 13 manufacturing cells, containing 6 major pieces of
equipment each, from a 68,000 square foot facility to a smaller,
31,000 square foot building in another state
Design Work
(CAD Modeling, FEA, etc.)
CAD